Laserfiche WebLink
J, Rio, JOHNSION SUPPLY,, INC* 1682 Pa <br />Much of the greenhouses are now, utilized f'ori storiage which is not <br />allowed by the building c�ode. The existing� temporary green ouses are <br />Plasiti <br />6, The new <br />greenhouses,, to be constructed in the Phase Two, <br />will be done <br />with *Insulated plastic and will likely, enhance the, appearance of the <br />westerly <br />portion of the site neariest Long Lake Road. <br />The reduced <br />drawings <br />are somewhat hard tio read at that scale, but <br />large scale <br />drawings <br />will be presented at the Planning Commission <br />and Council <br />hearingsial <br />It will be helpful if members, of the Planning Commission and <br />Council could look at the site. Many, of you are already <br />familiar with <br />the area. <br />7* One of <br />the results that we think is im�porit,a,nt, is that the south <br />elevlation <br />of all of the structures will either be new or <br />reconditioned, <br />thus, the <br />*Impact, on contiguous properties and those to the <br />south should <br />be enhanced by the improvernents proploseid�.1 <br />