My WebLink
|
Help
|
About
|
Sign Out
Home
1986_0811_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1986
>
1986_0811_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2011 2:41:12 PM
Creation date
12/12/2011 2:32:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Je R. Johnson Supply <br />Summary of Scope of Work <br />July 2, 1986 <br />,Zle Building Demolition and Construction <br />Removal of two thirds of the temporary green�holuse at the southeast, <br />corner and replace with a warehouse buildnge The exterior will be <br />precast concrete wall panels with an aggregate finish. <br />4. <br />Phase III - 1987 AM 1988 <br />A,. Greenhouse Construction <br />16 Extend exi sti rig grieenh�ouse . <br />20 Add new greenhouse in front of existing gr,elen housie. <br />B 81 Building Constructi0i <br />1* Add enclosed garage addition to floral distribution building., <br />211, Refinish Belden plastic garage (existing con c,81 block will have an <br />aggregate finish to match the precast concrete wall panels. <br />.1-1hase 111 1988-1989 <br />
The URL can be used to link to this page
Your browser does not support the video tag.