Laserfiche WebLink
Page 2 <br />Je R. Johnson Supply <br />Summary of Scope of Work <br />July 2, 1986 <br />,Zle Building Demolition and Construction <br />Removal of two thirds of the temporary green�holuse at the southeast, <br />corner and replace with a warehouse buildnge The exterior will be <br />precast concrete wall panels with an aggregate finish. <br />4. <br />Phase III - 1987 AM 1988 <br />A,. Greenhouse Construction <br />16 Extend exi sti rig grieenh�ouse . <br />20 Add new greenhouse in front of existing gr,elen housie. <br />B 81 Building Constructi0i <br />1* Add enclosed garage addition to floral distribution building., <br />211, Refinish Belden plastic garage (existing con c,81 block will have an <br />aggregate finish to match the precast concrete wall panels. <br />.1-1hase 111 1988-1989 <br />