Laserfiche WebLink
Al (njj;l�j a M, �Iffle <br />MCC i I IN %.7 <br />DATE'.' <br />AGENDA, SECTION ORIGINATING DEPT, /'DI�V. DEPT. HEAD APPROVAL, <br />REPORTS AND REIMMENDATIONS PUBLIC WORKS <br />ITEM NO.'. ITEM <br />Ili ESCRIPTION'.i MGR. REVIEWED/ RECOMMEW <br />T'Taffic signals on Snel I ing at County load C, <br />C2P and Lydia <br />7 <br />'The third signal is at Lydia, The existing traffic signal would be upgraded <br />and, modernilized. This $2090100 cost Would be split between the city and the <br />sitate,i again,, basedi on two of the four, liegs, being under the clity's jurisdiction. <br />b <br />Liast i tem would be to init erconnect and coord inate all three of these s ignals at <br />a total cost of $40 000. The proposed, city share of this cost is 33%, or <br />zpproxillimately $131,000. Having these lightis connected and coordinated i's <br />importan't,, so that, they can, be properly timed, and traffic flows can be <br />uninterrupted, <br />REQUESTED COUNCIL ACTION.* Motion authorizing the city staff to contact MnDOT <br />411 <br />and, indicate the city's interest in having signal <br />improvements on SnellaLng Avienue at County Road C, <br />C2i, and Lydia Avenues,.1 <br />