My WebLink
|
Help
|
About
|
Sign Out
Home
2011-12-20_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2011
>
2011-12-20_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2011 3:33:48 PM
Creation date
12/15/2011 3:27:12 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
12/20/2011
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: December 20, 2011 Item No: 4 <br />Item Description: Communication Items <br />Projects update- <br />• Check for City Construction project updates at: www .cityofroseville.com/nroiects <br />• Josephine Woods — The weather prevented the Contractor from installing curb <br />and gutter. After paving a temporary access road on the Dunlap street alignment, <br />the contractor has buttoned up the site for winter. The city has issued 4 building <br />permits for new homes. The home construction should continue through the <br />winter. The City Council awarded a contract for engineering services for the <br />Josephine Lift Station Replacement. <br />• County Road B2 & Rice Street Reconstruction Phase 2- the City Council ordered <br />the feasibility report for these projects at their December 12th meeting. <br />Park Improvement Projects- engineering is working with Parks on identifying <br />priority pathway projects for construction over the neat 4 years. One of the <br />projects identified is the County Road B2 pathway project. We are working on <br />estimates and schedules. <br />o Staff is working on plans for the following projects: <br />• Fairview Pathway (NE Suburban Campus Connector) Phase 2 <br />• 2012 Mill and Overlay <br />• County Road C2- sidewalk and connection <br />• Drainage improvements <br />• Sanitary Sewer Lining Project <br />• Waterman lining project <br />• Budget and Utility Rate update <br />• Other <br />Recommended Action: <br />None <br />Attachments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.