Laserfiche WebLink
F YCLYLUOUlo W.L ILFl <br />AI Q.Qn * li ale <br />negolliaa,zl <br />n <br />naa <br />now <br />been cow plated • <br />� �� <br />� $241�9700 <br />,p <br />i <br />the preparation <br />specifications, <br />and <br />$27,30�O for <br />the <br />observation, <br />of, construction. <br />It <br />should be <br />noted <br />that <br />this includes <br />$13,900 for <br />the extension, <br />of Long Lake <br />Road from Terminal, <br />Road <br />to <br />the <br />south frontage <br />road, This <br />is being <br />covered <br />under Amendment No.1 2 <br />which is <br />also <br />being considered at <br />this meeti <br />In addition to the <br />work on the contract <br />itself <br />it is desirable <br />to use the irm <br />of <br />SEH <br />to do the inspection <br />of the <br />construction, <br />the staled. ng <br />for the c' <br />and d. <br />_ portion <br />of the <br />test that <br />will be required, <br />These <br />po'rtio'ns of the <br />project <br />are not covered <br />in the <br />lump sum agreement <br />but <br />would <br />be done <br />in accordance <br />with the actual <br />cost <br />and <br />a <br />multiplier <br />that has <br />set forth <br />�n the <br />original <br />engineering <br />agreement. <br />At the current <br />time, <br />It is estimated <br />that this <br />port <br />ion of the <br />work would <br />cost, approximately <br />$178,200. <br />This includes, <br />some <br />costs <br />of testing <br />anticipated <br />to be done <br />by T <br />and <br />alp <br />of the <br />associated roadway <br />utility <br />lighting <br />d other, work <br />as well as <br />the extension <br />of <br />Long <br />Liake Road These <br />expenses <br />would <br />not be incurred, of <br />course, unless <br />the <br />project <br />actual. <br />y went to fruition <br />and <br />construction <br />ryas <br />undertaken. <br />The consultant <br />would <br />be <br />instructed, <br />to do this <br />by the <br />city staff <br />at that <br />time <br />the <br />Amendment No. 2 <br />which was <br />referred <br />to earlier, <br />covers the <br />consulting <br />costs <br />for, <br />the <br />extension <br />of Lang Lake <br />'ad from <br />malign <br />Terminal <br />Road southerly <br />to, the <br />frontage <br />road, <br />along Illllllllllllllll35W. <br />This work <br />was originally <br />anticip'ated to <br />e done in <br />19816 as <br />part <br />of <br />the <br />tax increment p'ro'gram <br />and <br />it is <br />recommended that Ot be <br />done as part <br />of this <br />pro <br />je <br />ror <br />ease of construction <br />and <br />continuity <br />of traffic <br />flow. <br />COUNCIL <br />ACTION: <br />The approval <br />of <br />Amendment 1 and <br />2 for a <br />lump sum <br />payment <br />to' SEA <br />the amount <br />of $,21,41,7010 010 <br />for the <br />preparation <br />of <br />plans and specifications, <br />and <br />$27,,300 <br />fair the <br />observation of <br />construction <br />as <br />lump slum <br />payment <br />in conjunction <br />with Project <br />1e, <br />8 4 -16 <br />