Laserfiche WebLink
CafeciiM Re"neo <br />page 2 <br />Gx*diag and .' I l g drainage swales generally follow the east and vest <br />.property 11" to the lake. � The floe of these al s l m Wined at their <br />existing el,evelion,s. The plaved and vegetated surfaces of the site vill be sloped, to, drain to <br />theme . The roof drainage V1611, also directed to the side males. The patio and lava <br />o. the nom td! ill drained to the lake. <br />Wiring construction. expo ill be graded to &Uo eroded ., to � out <br />froex runoff' v alt fence vill b constructed t and el . d, throughout the <br />construction period, to, intercept end w parficles� from the runoff <br />vater melon off exposed <br />.l �1 prosecuted in a, <br />el ,per to a the !length of time SO, surfaces exposed to runoff'vaters. <br />g eA �r eval. Th" e r ec will b removed � needed to emit <br />the Placement, of the buH & paved surfaces. and proposed planting indicated on the <br />Coed next page <br />