Laserfiche WebLink
1'?E11Q1UEST FOR COUNCIL ACTION D A <br />• <br />Department Approval: Manager Reviewed: Agenda Section <br />Reports and recommendations <br />projects Item Description: initiation, of ' both the east <br />Frontage Roads d priov3lide drainage - <br />both east, and west of I-35/Trunk HighwaY 36 south of County <br />Road C. These projects are identified M, P-85-18, 7 <br />■ i <br />1'ith the initiatil"on, of activit on the proposed <br />between County Road, B-2 and Long Lake Road, a review <br />of the roadway system f <br />was done, It wa concluded that to make the area, existing Frontage Roads on both the east, side and west side of 35W/36 south of <br />County - iI be upgraded, s �upgriading various <br />storm drainage systems also, will need to be constructed, <br />It is envisionled, that four separate assessiment projects will evolve fro the e <br />activities, These would, 'be + assessments on each of the roadways and <br />storm sieweir assessments for, those plo,rtiioins, of' the areas not previously having <br />storm drainiage systems or, having been assessed, 'in the past. Such a proces's is <br />in, keepir4cr r, <br />increment, program <br />as was established as well <br />A gienerial, city p assessments, <br />Due to the fact that these Frontage R'o,adi impprovements need special coordination <br />with tihie activities taiking place on, the bridge improvement, it is recommended <br />Hendrickson, that the consulting firm of Short, Elliott, and be utilized <br />to, provide, the engineering services to accomplish them,, The first phase would <br />be to have the feasibility studies, done foir, each of these improvements, The <br />