Laserfiche WebLink
P'IANNING REPORT <br />CASE NUMBER: 1483-84 <br />di <br />APPLICANT: The Housinj Alliance <br />1■� <br />g, Soil BoxIngsil,, Obviously, the site, plan in this -case is heavily influenced <br />by the, soil conditions. These should be delineated so as to validate <br />the extent ofi' tihese conditions and to allow for a -greater understanding <br />of the impact of the soi.1 conditions on the part of the Planning Commissiont <br />Cou.ncil, and-the neighbors, <br />ho Engineering Issues. These issues can be solved, The dedication for <br />County Rolad BI w1211,, of course, appear as part of +o Details <br />in engineering solutions can be left to engineering staff review with <br />the.condition that such review ble*,a part of any approval motion propoself <br />on the Part of the Planning Com3il-sision and/or the Council. <br />