Laserfiche WebLink
Revised .35/20/84 <br />STANDARD PROCEDURE FOR CITY ACTION ON ENVIRONNIENTAL ASSESSMENT <br />WORKSHEETS (EA11) AND ENVIRONMENTAL IWA,CT STATEMENTS (EIS) <br />(tACKGROUND STATEMENT: The procedure for dealing with environmental ' <br />issues was <br />Bi If' a private party submits a request for a spec lial <br />use, permit,.,, PUD., variance, plat or s'&ml*lar action; <br />A <br />it will be reviewed by the planning individual re- <br />sponsilbleto determine if the project 'is in the re- <br />quired or discretionaTy category for an EAVI. <br />Cei If a private party subrAu-ts a request for building <br />permits., 'it will, be reviewed by code enforcement <br />0 9 <br />staff to detiermine if the project is in the required <br />or discretionary category for an EA11. <br />D. If it is a, clity project, the department responsible <br />for the prioj�ect, would review it as in "B" above. <br />II�. Decision of Neeld for an EAJ <br />A. The ERB., consisting of a respresentative from Adminis- <br />t,rat, 'loin, as chairperson, and representatives from <br />Engineering and Code Enforcement; shall meet to de. <br />termi,ne the need for an EAW, <br />(3) The mleelt,ing would be held as soon as reasonably <br />i <br />possible. (Within 15 days 'if a petition 'is <br />9 <br />inviollved.) <br />