My WebLink
|
Help
|
About
|
Sign Out
Home
1984_0423.ws_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1984
>
1984_0423.ws_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2011 11:22:11 AM
Creation date
12/19/2011 11:20:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised .35/20/84 <br />STANDARD PROCEDURE FOR CITY ACTION ON ENVIRONNIENTAL ASSESSMENT <br />WORKSHEETS (EA11) AND ENVIRONMENTAL IWA,CT STATEMENTS (EIS) <br />(tACKGROUND STATEMENT: The procedure for dealing with environmental ' <br />issues was <br />Bi If' a private party submits a request for a spec lial <br />use, permit,.,, PUD., variance, plat or s'&ml*lar action; <br />A <br />it will be reviewed by the planning individual re- <br />sponsilbleto determine if the project 'is in the re- <br />quired or discretionaTy category for an EAVI. <br />Cei If a private party subrAu-ts a request for building <br />permits., 'it will, be reviewed by code enforcement <br />0 9 <br />staff to detiermine if the project is in the required <br />or discretionary category for an EA11. <br />D. If it is a, clity project, the department responsible <br />for the prioj�ect, would review it as in "B" above. <br />II�. Decision of Neeld for an EAJ <br />A. The ERB., consisting of a respresentative from Adminis- <br />t,rat, 'loin, as chairperson, and representatives from <br />Engineering and Code Enforcement; shall meet to de. <br />termi,ne the need for an EAW, <br />(3) The mleelt,ing would be held as soon as reasonably <br />i <br />possible. (Within 15 days 'if a petition 'is <br />9 <br />inviollved.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.