My WebLink
|
Help
|
About
|
Sign Out
Home
1984_0423.ws_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1984
>
1984_0423.ws_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2011 11:22:11 AM
Creation date
12/19/2011 11:20:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO Revised 3/2/84 <br />TO: James Andre <br />FRON: Charles Honchell <br />Wi <br />RE* Environmental Review Process, <br />PETITIONS <br />Twienty-five peolpil,e (no special reilquirements) sign a petition and <br />send 16ti to the Environmental Quality Board (EQB) for an EAW petim- <br />tion. It, must state what they, want to review and why it is neces- <br />sary . <br />11 <br />The E,QB determines who is the appropr'late responsible governmenta <br />'unit (R.G.U.) The City of' Rosevillek will probably be the RGU fo <br />pro3eicts within, our boundary,. The city has about 15 days to de-- <br />cide If an, Environmental Asisiessment Worksheet (EAW) is needed. <br />Certain threshholds exist to impact this decision,, i <br />Threshholds <br />(1) If the Project is bellow a certain size, an EATI cannot be <br />ordered (Most projects will be, in this catagory) <br />(2) I�f the project 'I's ablove a certain size,, it mmstt -he order <br />ed,. (Fewi Proli eicts wi 11 be 'in thi's catagory) . <br />4- 1 <br />4 <br />(3) If It is within these limits,, the city has the decision <br />of dietermin1lng If an EAW "is needed* (Many projects will be in <br />this catagory). in the discussionary range, an EAW is to be Pre- <br />I <br />[*areid when, 'it, is found that, the project may have the potential for <br />significant environmental ef'fect. <br />I!. NORMAL PROJECTS <br />The city must review to determine, 'if an EAw is required'-(or de- <br />1 il I <br />sired), on, all projects where it has permit or approval authority <br />This includes projects not involving a petition, (Same threshhold <br />as abolve, but done in var ousl ways) <br />IN �Li 01*A <br />Th6 city must develop a procedure for handling the EAW'r and EIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.