Laserfiche WebLink
MEMO Revised 3/2/84 <br />TO: James Andre <br />FRON: Charles Honchell <br />Wi <br />RE* Environmental Review Process, <br />PETITIONS <br />Twienty-five peolpil,e (no special reilquirements) sign a petition and <br />send 16ti to the Environmental Quality Board (EQB) for an EAW petim- <br />tion. It, must state what they, want to review and why it is neces- <br />sary . <br />11 <br />The E,QB determines who is the appropr'late responsible governmenta <br />'unit (R.G.U.) The City of' Rosevillek will probably be the RGU fo <br />pro3eicts within, our boundary,. The city has about 15 days to de-- <br />cide If an, Environmental Asisiessment Worksheet (EAW) is needed. <br />Certain threshholds exist to impact this decision,, i <br />Threshholds <br />(1) If the Project is bellow a certain size, an EATI cannot be <br />ordered (Most projects will be, in this catagory) <br />(2) I�f the project 'I's ablove a certain size,, it mmstt -he order <br />ed,. (Fewi Proli eicts wi 11 be 'in thi's catagory) . <br />4- 1 <br />4 <br />(3) If It is within these limits,, the city has the decision <br />of dietermin1lng If an EAW "is needed* (Many projects will be in <br />this catagory). in the discussionary range, an EAW is to be Pre- <br />I <br />[*areid when, 'it, is found that, the project may have the potential for <br />significant environmental ef'fect. <br />I!. NORMAL PROJECTS <br />The city must review to determine, 'if an EAw is required'-(or de- <br />1 il I <br />sired), on, all projects where it has permit or approval authority <br />This includes projects not involving a petition, (Same threshhold <br />as abolve, but done in var ousl ways) <br />IN �Li 01*A <br />Th6 city must develop a procedure for handling the EAW'r and EIS <br />