My WebLink
|
Help
|
About
|
Sign Out
Home
1984_0507_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1984
>
1984_0507_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2011 1:19:00 PM
Creation date
12/19/2011 1:14:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I= <br />!M10m, Mit <br />L: a t I -Wx U!l fl 9 LAI [q <br />MEETING <br />DATE: <br />5/7/84 <br />AGENDA, SECTION' <br />ORI INATIl G <br />I DEPT. /DIV.." <br />DEPT. HEAD APPROVAL. <br />REPORTS AND RECOMMENDATIONS <br />PUBLIC <br />WORKS <br />ITEM NO.'.' <br />ITEM DESCRIPTION. Receipt of' BILds foT <br />Project SS-W-P-83-17 <br />MGR. EVIE RECOMME�. <br />E: OPW <br />F e rri s Lane <br />On April <br />123 198.4, the city received bids <br />for utilities and paving <br />on Ferris Lane <br />Pro'ect <br />83-117. The city received 12 bids <br />for this. work, with results as follows; <br />A. P. Keller <br />1371 8 51 3.6 0 <br />Robert, More Construction <br />1,38.1,5,06.,60 <br />0 & P Contracting <br />14311S 3701.1,4 <br />Total Asphalt Construction <br />1,44.12,96 * 70 <br />Ro-,So <br />146 3 9�9 2. 010 <br />Burschville, Coast ructi.on, <br />1,52.9 270 .5 <br />O�rfe i and Sons <br />1521,0411.1211 <br />Alexander Construction <br />152,663.9�O <br />Ashbach Construction <br />154.9154. 70 <br />Nodland Assoc* <br />155, SI 3. 7 5 <br />Dawsion Construction <br />167,Y716.75 <br />A <br />Crossing, Inc. <br />170,t 0 28. 80 <br />I <br />A. Pl. Keller Construction was low bidder with a total, bid of $137,853.60. This <br />bid i's wel,l below the feasibility estimate prepared for this project. We have re- <br />viewed the contractor's qualifications and find him, acceptable for award. <br />UCOMMENDED COUNCIL ACTION: Adoption of a resolution accepting the bid of A. Pp <br />'I <br />Keller Cons t,ru,ct, loin Company for Project SS-W-P-83-17, <br />Ferris Lane, in the amount of $137.853.60. <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.