Laserfiche WebLink
I c) Grading, Drainage and Erosion Control Plan <br />2 d) Grading Notes and Details <br />3 e) Street,, Sanitary sewer and Watermain Details <br />4 f) Tree Preservation Plan <br />5 g) Sanitary sewer, watermain, storm sewer and street plan. <br />6 h) Pathway, Retaining Wall and Fence plan. <br />7 <br />8 E. Notice to Proceed. The improvements shall be installed in accordance with City details, standards, <br />9 and ordinances. The plans and specifications shall be prepared by a competent registered <br />10 professional engineer, furnished to the City for review, and approved by the City Engineer. <br />I 1 1. The Developer shall obtain all necessary permits from the Minnesota Pollution Control <br />12 Agency (MPCA , Minnesota Department of Health (MDOH)�, and other agencies before <br />13 proceeding with construction. Copies of these permits must be provided to the City <br />14 Engineer. <br />15 2. The Developer or his engineer shall schedule a preconstruction meeting at a mutually <br />16 agreeable time at City Hall with all the parties concerned, including City staff, to review <br />17 the program for the construction work. <br />18 3. The Developer represents to the City that the plat complies with all City,, County,, <br />19 Metropolitan,, State and Federal laws and regulations including, but not limited to.- <br />20 subdivision ordinances,, zoning ordinances and environmental regulations. If the City <br />21 determines that the plat does not comply, the City may, at its option, refuse to allow <br />22 construction or development work in the plat until the Developer does comply. Upon the <br />23 City's demand, the Developer shall cease work until there is compliance. <br />24 <br />25 F. Time of Performance. The Developer shall install all required improvements enumerated in <br />26 Paragraph C which will serve the plat by October 15, 2011, The Developer may, however, forward <br />27 a request for an extension of time to the City. If an extension is granted, it shall be conditioned upon <br />28 updating the security posted by the Developer to reflect cost increases and the extended completion <br />29 date. <br />30 G. Inspection. The Developer shall provide the services of a Residential Project Representative and <br />31 assistants at the site to provide continuous observation of the Contractor's work. <br />32 <br />1. The Developer shall provide the City Engineer a minimum of one business day notice <br />33 <br />prior to the commencement of the underground pipe laying and service connection; and <br />34 <br />prior to subgrade, gravel base and bituminous surface construction. <br />35 <br />2. Developer's failure to comply with the terms of this section shall permit the City <br />36 <br />Engineer to issue a stop work order which may result in a rejection of the work and <br />37 <br />which shall obligate the Developer to take all reasonable steps, as directed by the City <br />38 <br />Engineer to ensure that the improvements are constructed and inspected pursuant to the <br />39 <br />terms of this Agreement; and shall further result in the assessment of a penalty, in an <br />40 <br />amount equal to I% per occurrence, of the amount of the security required for Developer <br />41 <br />improvements. <br />Page 4 of 13 <br />