Laserfiche WebLink
SFN <br />peed Skating Proposal Work Program • <br />Work To be Done By Howard, Dahlgreu Aissoiciat ea <br />We will be responisible for the preparation of sections A, B9 C, and E* We <br />IN <br />will incorporate the research already prepared by the committee and city <br />staf f it, We will coordinate, the prelparation of section F. with the <br />committee, <br />We, wii l. prepare the EAW and Regional Implact Assessments <br />VI <br />We will view the property, and, investigate the existing site conditions. <br />We will attlend the committee meetilngs, each wednesday night until the <br />submission package is compleite. We will meet with the chairman and city <br />It <br />staff' as requiredi to coordinate the materials to be included in the <br />ti IF s Is i on,. - <br />u <br />.0 <br />We will mAke a presentation before the Roseville City Counciffil to presenl <br />the pr,olposed facility at the Septembler 24ith meeting. <br />We wi'll worki with the commi'ttee to develop a, Site Master Plan for the <br />f'a,c i 1 *1 ty 9 <br />Work to, be done by the C I" ty S taff <br />Utility requirements for the projec,t will, be done by the city staff, It <br />oil expected that the ty staff can preplare a tiolpo survey of the property so <br />that we can prepare analysis drawingis and the master plan. <br />We will provide the site plan, and data, to, the city staff so that they might <br />AP, <br />prepare, a con struicti,on, cost estimate. We can assist the staff in <br />,estimating some of the site development costs with data re <br />that we alady <br />P <br />have.1 <br />III r, <br />We expect that the city start will be able to prepare traffic im <br />bm pact <br />9 <br />analysis of the priopoisied facillity suitable for inclusion in the final <br />s 'iis s i <br />u L LIOTS <br />The city staff should continue • investigate alternative snow storage <br />areas to replace,, the areas lost by the county on the site, <br />