Laserfiche WebLink
.4 01 <br />In Cost, Breakdown, <br />The', applicant has supplied the following cost breakdown.: <br />i � M1 63 VU <br />I <br />$22,/sf'. sihell 159y346 <br />$9 . 48/st . f ignish 68,664 <br />$22/sf. shell 107r800 <br />di <br />?27/sifel finish 132 F 300 <br />$22/sfa shell <br />$17/sfe finish <br />Acquisition (100,,1000 <br />Development (approx. 806v000 siq. ft) <br />A owl <br />I <br />at $11,.310/sr,i <br />Soil co,irrecit,ionis <br />'TOTAL is ITE <br />Archilitectural & Engiineeriving Fieeiis <br />Legal Fees <br />Bond Underwr iter <br />C I <br />tiy Bo�nd Counsel <br />City Administrative Expenses <br />1% IDB Holding Feei <br />otheir <br />TOTAL FEES, <br />@I <br />Interest During Construction <br />Cloint,lngenc leis (15%) <br />52,800 <br />40j,800 <br />75rOOO <br />25rOOO <br />15r000 <br />10,000 <br />l5r000 <br />15r000 <br />10jr000i <br />In add 1 tion,,Pl any and all c'ty expenses not specifie <br />above,, unpilaid asselsismentsi or assessments pending but not yet <br />leviRd Will have to be asicertained d pallid t the time of <br />i, <br />M • <br />an a <br />closing in accordance with the City's, piolicy. I <br />30EM <br />0 <br />2251 , 000 <br />1 jr 50 (Y <br />