Laserfiche WebLink
527 <br />528 <br />529 <br />530 <br />531 <br />532 <br />533 <br />534 <br />535 <br />536 <br />537 <br />538 <br />539 <br />54O <br />541 <br />542 <br />543 <br />544 <br />545 <br />546 <br />547 <br />548 <br />549 <br />550 <br />551 <br />552 <br />553 <br />554 <br />555 <br />556 <br />557 <br />558 <br />559 <br />560 <br />561 <br />h. Eros,ion and sediment control measures: methods, to be used to control erosion <br />and sedimentation on the site, both during and after the construction process, <br />i. TeMporaKy and Permanent stabilization: how the site will be stabilized during <br />and after construction is completed, including specifications, <br />j . Storm water management'. how storm runoff will be managed., including <br />methods, to be used if the development will result in increased peak rates, or <br />volume of runoff <br />k. Maintenance: schedule of regular inspections and repair of Bros on and <br />sediment control structures, <br />1. Calculations: any that were made for the design of such items, as sediment <br />basins, divers ,ions,, waterwqys, and other applicable practices, <br />E. Plan Review <br />1. General: The City appoints, the Cily Engineer to review the Bros on and sediment <br />control plan to ensure compliance with the City of Ros,eville Eros ,ion and Sediment <br />Control Standards,. <br />2. Permit required: If the City determines, that the erosion and sediment control plan <br />meets, the requirements, of this article, the City shall issue a permit, valid for a specified <br />period of time that authorizes, the land disturbance activity contingent on the <br />implementation and completion of the Bros on and sediment control plan. <br />3. Denial: If the City determines, that the Bros on and sediment control plan does, not meet <br />the requirements, of this article., the City shall not issue a permit for the land disturbance <br />activity. The erosion and sediment control plan must be resubmitted for uproval before <br />the land disturbance activiiy begins,. No land use and building permits, may be issued <br />until the Permittee has an approved Bros on and sediment control plan. <br />4. Permit suspension- If the Cily determines, that the approved plan is not b <br />implemented according to the schedule or the control measures, are not being properi'y <br />maintained, all land use and building permits, must be suspended and stop work order <br />issued until the Permittee has fully implemented and maintained the control measures, <br />identified in the approved Bros on and sediment control plan. <br />F'. Plan Implementation And Maintenance:. <br />All storm water pollution controls, noted on the approved Bros on and sediment control plan <br />shall be installed before commencing the land disturbance activity, and shall not be removed <br />without City Uproval or issuance of a Certificate of Completion. <br />The Permittee shall be responsible for proper operation and maintenance of all storm eater <br />pollution controls, and nail s,tabilization measures, in conformance with best management <br />practices,. The Permittee shall also be res,pons,ible for maintenance, clean-up and all dam <br />caused by flooding of the site or surrounding area due to in-place erosion and sediment <br />control. The foregoing res,pons,ibi lit ies, shall continue until a Certificate of Completion is <br />issued to the Permittee by the City for the land disturbance activity. <br />G. Modification Of Plan: <br />An approved Bros on and sediment control plan may be modified on s,ub mss ,ion of an <br />qppli cat ion for modification to the City and subsequent approval by the Cily Engineer. In <br />reviewing such application, the City Engineer may require additional reports, and data. <br />H. Escrow Requirement <br />The City shall require the Permittee to escrow a sum of money sufficient to ensure the <br />inspection, installation., maintenance, and completion of the Bros on and sediment control <br />