<br />h. Eros,ion and sediment control measures: methods, to be used to control erosion
<br />and sedimentation on the site, both during and after the construction process,
<br />i. TeMporaKy and Permanent stabilization: how the site will be stabilized during
<br />and after construction is completed, including specifications,
<br />j . Storm water management'. how storm runoff will be managed., including
<br />methods, to be used if the development will result in increased peak rates, or
<br />volume of runoff
<br />k. Maintenance: schedule of regular inspections and repair of Bros on and
<br />sediment control structures,
<br />1. Calculations: any that were made for the design of such items, as sediment
<br />basins, divers ,ions,, waterwqys, and other applicable practices,
<br />E. Plan Review
<br />1. General: The City appoints, the Cily Engineer to review the Bros on and sediment
<br />control plan to ensure compliance with the City of Ros,eville Eros ,ion and Sediment
<br />Control Standards,.
<br />2. Permit required: If the City determines, that the erosion and sediment control plan
<br />meets, the requirements, of this article, the City shall issue a permit, valid for a specified
<br />period of time that authorizes, the land disturbance activity contingent on the
<br />implementation and completion of the Bros on and sediment control plan.
<br />3. Denial: If the City determines, that the Bros on and sediment control plan does, not meet
<br />the requirements, of this article., the City shall not issue a permit for the land disturbance
<br />activity. The erosion and sediment control plan must be resubmitted for uproval before
<br />the land disturbance activiiy begins,. No land use and building permits, may be issued
<br />until the Permittee has an approved Bros on and sediment control plan.
<br />4. Permit suspension- If the Cily determines, that the approved plan is not b
<br />implemented according to the schedule or the control measures, are not being properi'y
<br />maintained, all land use and building permits, must be suspended and stop work order
<br />issued until the Permittee has fully implemented and maintained the control measures,
<br />identified in the approved Bros on and sediment control plan.
<br />F'. Plan Implementation And Maintenance:.
<br />All storm water pollution controls, noted on the approved Bros on and sediment control plan
<br />shall be installed before commencing the land disturbance activity, and shall not be removed
<br />without City Uproval or issuance of a Certificate of Completion.
<br />The Permittee shall be responsible for proper operation and maintenance of all storm eater
<br />pollution controls, and nail s,tabilization measures, in conformance with best management
<br />practices,. The Permittee shall also be res,pons,ible for maintenance, clean-up and all dam
<br />caused by flooding of the site or surrounding area due to in-place erosion and sediment
<br />control. The foregoing res,pons,ibi lit ies, shall continue until a Certificate of Completion is
<br />issued to the Permittee by the City for the land disturbance activity.
<br />G. Modification Of Plan:
<br />An approved Bros on and sediment control plan may be modified on s,ub mss ,ion of an
<br />qppli cat ion for modification to the City and subsequent approval by the Cily Engineer. In
<br />reviewing such application, the City Engineer may require additional reports, and data.
<br />H. Escrow Requirement
<br />The City shall require the Permittee to escrow a sum of money sufficient to ensure the
<br />inspection, installation., maintenance, and completion of the Bros on and sediment control