Laserfiche WebLink
u Livable Communities concepts incorporated into design guidelines, <br />Pathway Master Plan discusses ped and bike goals and policies. DS 7108 <br />Long Term Goals <br />Develop program to provide fire, safety, u <br />CPR, fire extinguisher training to <br />businesses <br />IN' <br />The Fire Department started offering fire training classes and CPR <br />classes to businesses and community members who request such <br />training. This started with the adoption of the City Fee Schedule on <br />November 17, 2008. RG 3109 <br />The Fire Dept will begin offering CPR/AE at a rate of $80 per <br />student and Safety Training at a rate of $80 per hour. Costs will cover <br />prorated trainer's salary/benefits, books, training materials, <br />administrative time. These services will be offered to businesses once <br />the City's fee schedule is amended to include these fees and this <br />JR2025 goal will be complete. RG 7108 <br />Community Center Discussion u Community Center identified in Adopted Park Master Plan, <br />November 2010 LB PH <br />• Discussions during Master Plan Implementation Phase, November <br />01 LB 1/11 <br />• Will be incorporated into the anticipated Master Plan process to <br />determine need and locations. LB 7108 <br />Establish a Community Resource and u Proposal accepted by the 2009 Leadership St. Paul Program to assign <br />Volunteer Center/ Network with support a group to Roseville to enhance the volunteer program by creating a <br />and coordinating staff to recruit, train, <br />comprehensive community volunteer model. LB 3109 <br />nurture volunteers. <br />u Researching possible resources needed to establish such a program <br />and what a program of this type would look like. LB 7108 <br />Identify segments with poor or no <br />u No new activity.. 6109 <br />connection. Follow Master plan guide. <br />u Developing Fairview NTP Pathway project for 2009 construction. <br />Address Hwy 3�6 and Snelling crossing <br />Seeking funding opportunities. DS 3109 <br />barriers: tunnels or bridges at Lydia, <br />u Pathway Master Plan adopted September 08. Seeking funding <br />Co C, Co B, or Roselawn <br />opportunities. DS 10108 <br />u Discussed as part of Pathway Plan update, incorporate into final draft <br />plus additional locations. DS 7108 <br />Consider Ro�undabouts, if space and <br />u Second Roundabout to be constructed in Twin Lakes Summer 2010 DS <br />buying R. .W. is feasible <br />5110 <br />u First Roundabout will be constructed late summer 2009 in Twin <br />Lakes Phase DS 6109 <br />u Roundabout included in Phase I Twin Lakes improvements <br />construction 2009. DS 310 <br />u No new activity. DS 10108 <br />u Look into ROW requirements and identify possible corridors 2009. DS <br />7108 <br />Add buses and routes for flexibility and Li Metro Transit evaluation Bus Rapid Transit for Snelling Ave. and <br />suburb-to-suburb travel other service to area including a new Park N Ride faciffityin Little <br />C'anadaDS 4111 <br />• Have had additional discussion with Metro Transit regarding <br />additional service to Park N Ride DS 4110 <br />• No new activity DS 6109 <br />• Explore opportunities created by new Park N Ride DS 3109 <br />• Discussed this flexibility with Metro Transit for Twin Lakes Park N <br />Ride facility. DS 10108 <br />• Continue to push this issue in all discussions with Metro Transit. DS <br />7 108 <br />