AW., <br />0111011010111 <br />0 <br />0 <br />1 Difi t PWO1101 //,)/,/ <br />1f <br />a e on, <br />pi <br />Hoines for Genieratiolls <br />Proposed Amendments <br />This ICU D amendment request includes two components that are necessary to complete the design and <br />construction of Sienna Green Phase 11: <br />• Incorporate the small property known as the "triangle" into Sienna Green Phase 2; and, <br />• Reduce the building setback from 40 feet to 15 feet from the western property line. <br />C <br />With these two amendments, Aeon will be able to complete the Sienna Green Phase 11 design process. The <br />project will conform to all other requirements of the ICU D agreement as well as the newly adopted building <br />design standards in the Roseville Zoning Code that were not in place when the ICU was first approved. <br />g C <br />The Ttiangle o 1, <br />pe�ry <br />WI-ien the Sienna Green project was approved by the City in June 2009, the plans for Phase 11 did not yet <br />include the "triangle" parcel immediately north of Lot 2 because the ownership history had not been fully <br />resolved (Attachment B). The parcel is now owned by Aeon. This ICU D amendment request is accompanied <br />by a plat application to combine Lot 2 of the Sienna Green Addition and the adjacent triangle parcel into one <br />parcel for the Phase 11 project. The proposed amendment will update the legal description in the PUD <br />agreement to include the legal description of the newly combined lot. <br />Build Ng Selback A juslwent <br />The site layout for Phase 11 in the original ICU D approval was largely conceptual since final design was not <br />C <br />scheduled to occur until funding was secured and ownership of the triangle was clarified since both items <br />would impact final design. With funding secured and the triangle ownership question resolved, the design <br />process was initiated. <br />Upon re'Viewing the site layout, a rectangular building instead of a "dog leg" style building shown in the <br />C <br />original ICU D provides for more efficient and cost-effective construction as well as better long-term use of <br />the site itself With the addition of the triangle parcel, the combined property can now support the rectangular <br />building. As we entered the design phase, it was also determined that the building needed to be lengthened to <br />accommodate the underground parking and the minimum a artment sizes needed to meet design standards <br />p <br />set by the NEnnesota Housing Finance Agency. <br />WI-iile the proposed setback adjustment reduces the building setback from 40 feet to 15 feet from the western <br />C <br />property line, only a corner of the building actually extends to the 15 foot mark. Almost all of the building <br />actually remains behind the 40 foot setback line (Attachment C), and it is still more than 200 feet from the <br />closest building on the adjacent property (Attachment D). Please note that the new underlying HIT -1 zoniing <br />district permits a 10 foot setback from the western property line. <br />3rd Street Stfite 300, Mi"1111eapolis, MN 554][5 48 6 4 .�����4208F' <br />3 1 31 1 3 1 <br />Page 3 <br />