My WebLink
|
Help
|
About
|
Sign Out
Home
2011-11-01_PR_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2011
>
2011-11-01_PR_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2011 12:41:15 PM
Creation date
12/21/2011 12:39:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 29,2011 Draft#1 <br /> Roseville Trail Projects: <br /> 1. County fed 132 from Lexington to Rice with connectors to Central Park and Acorn <br /> Park <br /> $1,000,000 sidewalk on south side., bike large on both sides <br /> 2. County Fed B from Estes Ind to Cleveland <br /> $500,000 logistically tied up with road ownership, <br /> Road rebuild at same time would make project feasible to address drainage <br /> issues. If transferred to Roseville with it would be at least 5yrs <br /> 3. Oasis Park— Langton Lake Park connectors <br /> $350,000 for bridge and trail C2 to Oasis on existing easement <br /> Consider combination with natural enhancements <br /> 4. Southwest Roseville stormwater upgrades with natural trails <br /> $150,000 stormwater management needs may create opportunity <br /> school/park/church concept <br /> Roseville Natural Resource Projects: <br /> HANG <br /> Boardwalk replacement to create loop ($500,000) <br /> HAN C facility improvements (siding, storage, consider previous committee <br /> recommendations) ($250,000) <br /> Vegetation management including buckthorn arid.purple loosestrife removal as <br /> well as prairie and wildflower garden enhancements ($50,000) <br /> i nage improvements at entrance ($25,000) <br /> Evaluate and assess (and address is possible compost water quality effects <br /> ($25,000) <br /> Targeted wetland restoration and potential hydrology ($300,000) <br /> Reservoir Foods <br /> • lPraide restoration with interpretive sig nape - Large area North of the reservoir <br /> and smaller area East of Dale St. tunnel ($50,000) <br /> • Enhancement of trail network North of reservoir including: signage and maps, <br /> limited clearing, surface preparation ($100,000) <br /> • Buckthorn removal and management— Initial effort using professional services <br /> with annual volunteer efforts to address re-establishment. ($300,000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.