Laserfiche WebLink
October 26, 2011 Draft#2 <br /> Roseville Trail Projects: <br /> 1. County Rd B2 from Lexington to Rice with connectors to Central Park and Acorn Park <br /> $1,000,000 sidewalk on south side, bike lane on both sides <br /> Options to reduce cost such as grants or partners should be evaluated. It should be noted that <br /> these options may create conditions or criteria that may complicate implementation. <br /> 2. County Rd B from Estes Rd to Cleveland* <br /> $500,000 logistically tied up with road ownership, <br /> Road rebuild at same time would make project feasible to address drainage issues. If <br /> transferred to Roseville with $ it would be at least 5yrs <br /> *Uncertainty of road transfer makes this project potentially un-implementable within 5 year <br /> period. <br /> 3. Oasis Park — Langton Lake Park connectors <br /> $350,000 for bridge and trail C2 to Oasis on existing easement <br /> Consider combination with natural enhancements <br /> 4. Southwest Roseville stormwater upgrades with natural trails <br /> $150,000 Stormwater management needs may create opportunity <br /> school/park/church concept. The status of stormwater upgrades are uncertain which creates <br /> uncertainty in implementing this project. <br /> Alternate trail projects for consideration: <br /> • Increased bike lane on Victoria from County Rd B to Northern city limits <br /> • Enhance Terminal Rd and Walnut Road trail <br /> • Partner with Ramsey County For County Rd C connection to Northeast Diagonal Trail <br /> • Prior Rd County Rd B to Roselawn <br /> • Oakcrest Rd link between Willow Pond Park and Pocahontas Park <br /> • Fernwood and Eldridge Rd connecter between Brue Russell, Keller Mayflower, and Lexington <br /> Park <br /> • Shryer Ave connection between Pioneer Park and Reservoir Woods <br /> • Tamarac Park to trail on South side of McCarrons Lake <br /> • Hand Ct. to Grandview connector near Materion Park <br /> • Matilda Rd connector between Mapleview and Ladyslipper Parks <br /> • Valley Park connector to W Owasso Rd trail <br /> Roseville Natural Resource Projects: <br /> HANC <br /> • Boardwalk replacement to create loop ($500,000) <br />