My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0711_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0711_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:42 PM
Creation date
12/21/2011 3:25:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 acceptable resulting in congestion along Cleveland Avenue and Twin Lakes Parkway <br />%1.11 <br />34 e, Adding dual northbound Cleveland to I - 5W left turn lanes to maintain acceptable <br />35 traffic operations at the I- 35W/Cleveland/Twin Lakes Parkway intersection. Prior to the <br />36 construction of Twin Lakes Parkway, this intersection had three legs. Introducing a fourth leg as <br />37 well as planning for background growth, the dual left turn lanes are necessary. <br />39 The preliminary layout for this improvement is attached. <br />40 POLICY OBJECTIVE <br />4 'i These improvements are identified in the Twin Lakes AUAR as traffic mitigation. By <br />42 approving the submission of the STP Funding Application, the City is taking a proactive step <br />43 to leveraae external funds to assist with the construction of the public roadways and utilities <br />44 within the Twin Lakes Area. <br />45 FINANCIAL IMPACTS <br />46 STP funds can only be applied to construction costs, and a local match of 20% is required. <br />47 Engineering costs are solely the responsibility of the City. The total STP Amount Requested.- <br />4,', $667,200,, with a total City cost share of 30%.- $,296,800. Ultimately the city cost share will be <br />49 paid through future redevelopment cost allocations as identified in the Twin Lakes AUAR <br />5o Infrastructure Improvement Study. What follows is an estimate of the construction costs for this <br />'i proj ect. <br />Design Engineering <br />$26,p000 <br />Environmental Review/Permitting <br />$4,p000 <br />Construction <br />$,834,POOO <br />Construction Engineering <br />$1 1 WPM <br />FTotal Cost <br />$964,000 <br />52 STAFF RECOMMENDATION <br />53 Adoption of a resolution of support for Surface Transportation Program STP l- Urban Guarantee <br />application for Twin Lakes Infrastructure. <br />55 REQUESTED COUNCIL ACTION <br />6 Adoption of a resolution of support for Surface Transportation Program STP l- Urban Guarantee <br />application for Twin Lakes Infrastructure. <br />Prepared by: Kristine Gig a, Civil Engineer <br />Attachment A: PrQject Concept Drawing <br />B: Resolution <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.