Laserfiche WebLink
Ifni I 11111� <br />Did the, School District sell the Lake Owasso School to Group W Cablei <br />A. No. DistrilLet 623 and Group W Cable have a proposed agreement • a Ion <br />tierm lease (15 yiears) for the building.1 This allows the School Board <br />flexibl.lity long into the future for the disposition of this property.1 <br />What is Group W Cable g�olg to do at the building? <br />,Q. Will Group W Cable change the 'building at all? <br />01 <br />A. We have agreed to remodel the building and upgrade the mechanical <br />systems. The majorl".ty of the work willbe done inside the building <br />and no additions or wings are. planned. <br />I <br />'11 this affect the amount of people and traffic at the Lake <br />How wi, <br />Owasso Bui 1ding'? <br />A. Giroupi W' Cable will have fewer employees than both of the current <br />tiennant,s at, the Lake Owasso Building. Adequate parking is avai 1 <br />able and, wie feel, the traffic impiaict �will be minimal as compared t <br />thW, current uses for this building. <br />1. What will happien to the playground/ballfield? <br />