Laserfiche WebLink
TJEETING 6/13/83 <br />REQUEST FOR COU.N.-C-IL ACT1O..N DATE: <br />A,G'EN�DA SEC�TIO�N�: mORIGINATING DEPT/DIV..' DEPT, HEAD -PPROVAL. <br />Ad n * st, rat ion <br />Reports & Recommendati(xis nu I <br />ITEM NO. I T'E M DESCRIPTION" Proposals for engineering design of' an a-ir MGR. REVIEWED/RIECOMMENDb. <br />diehufflu'dificatilm system for Ice Arena. <br />E- 12 <br />The 1983 budget, includes $ for installation of a dehumi difi cation system <br />at the Ice Aren,a.1 The system, will eliminate the pirobilem of moiistuTe build-up <br />in the Arena caused by the" warm, hum'd air that enters the building and mixes <br />with the c,olol, air. The result is fog which forms over the 'ice and moisture <br />which forms, on the, walls, floors . and cei'ling.1 <br />The folliowing proposals h,ave been received- to prepare the specifications for <br />t h, e, pro, j e ct 4 <br />B idder Amount- <br />Jacus Associates Inc. $21000 <br />Michaud, Cooley, Hallberg, ri <br />.p E " c on, Associ, aces, Inc. $22880 <br />It is recommended the low proposal from, Jacus be accepted, <br />Council Action Requested,*, Motion, retaining Jacus Associates to prepare drawings <br />and speccatims, approve shop drawings,, and conduct <br />0 W <br />construction inspections in the, total fee of $2,000, <br />