My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1421
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:42 PM
Creation date
12/21/2011 4:15:51 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/28/2011
Ordinance #
1421
Ordinance Title
AN ORDINANCE AMENDING CHAPTER 314.05, FEE SCHEDULE ADOPTING THE 2012 FEE SCHEDULE
City Code Chapter Amendment
C314.05
Ordinance Date Passed
11/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2012 Fee Schedule <br /> 0. For inspection of transient projects, including but not limited to, carnivals and <br /> circuses, the inspection fees shall be computed as follows: <br /> Power supply units according to Item `B"of fee schedule. A like fee <br /> will be required on power supply units at each engagement during the <br /> season, except that a fee of$35.00 per hour will be charged for <br /> additional time spent by the Inspector if the power supply is not ready <br /> for inspections as required by law. <br /> Rides, Devises or Concessions: Shall be inspected at their first <br /> appearance of the season and the inspection fee shall be $35.00 per unit. <br /> P. The fee is doubled if the work starts before the permit is issued. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.