My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1421
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:42 PM
Creation date
12/21/2011 4:15:51 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/28/2011
Ordinance #
1421
Ordinance Title
AN ORDINANCE AMENDING CHAPTER 314.05, FEE SCHEDULE ADOPTING THE 2012 FEE SCHEDULE
City Code Chapter Amendment
C314.05
Ordinance Date Passed
11/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2012 Fee Schedule , <br /> Current Proposed <br /> f=ee /Charge Description City Code Amount Amount <br /> $1/cu.yd. up to $1/cu.yd. up to <br /> Soil contamination 406 $300 $300 <br /> Solid waste hauler 402 125.00 125.00 <br /> Stormwater drainage fees 803 separate resolution separate resolution <br /> Stormwater residential permit 250.00 250.00 <br /> Stormwater residential permit renewal (5-years) n/a 100.00 100.00 <br /> Street patching fee (d) n/a 600/ 1,200 600/ 1,200 <br /> Theaters—per viewing screen 310 70.00 70.00 <br /> Tree planting and removal 706 separate ordinance separate ordinance <br /> Utility service location fee N/A 100.00 100.00 <br /> Vehicle forfeiture impound fee (per day) N/A _ 20.00 20.00 <br /> Water connection fees 801 see Appendix—A— see Appendix A <br /> Water usage fees 801 separate resolution separate resolution <br /> Water tower permit—private use 801 separate resolution separate resolution <br /> Well permit 801 separate resolution separate resolution <br /> Wireless permit fee 1205 Negotiated Negotiated <br /> (b) In addition to the$525 base fee,a charge of 4%(increased from 3%)of the total improvement cost is <br /> also assessed. <br /> (c) Calculation is made on 5%of the estimated fair market value of unimproved land,as determined by the <br /> Ramsey County Assessor's office on the date of approval of the plat or subdivision. <br /> (d) Street patching fee is$600 without a curb,and$1,200 with a curb. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.