My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0613_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0613_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:43 PM
Creation date
12/22/2011 8:43:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Approval <br />I��`°�S�o�E <br />REQUEST FOR COUNCIL ACTION <br />Date.- June 13,, 2011 <br />Item No..- 12 . e <br />Acting City Manager Approval <br />Item Description.- Appoint City Representative to Metro Transit Arterial Transitway <br />Corridors Study Stakeholder Workshop <br />I BACKGROUND <br />2 Metro Transit is establishing a stakeholder group to work in an advisory capacity for their <br />3 Arterial Transitway Corridors Study. The city and Metro Transit have a substantial interest in <br />4 providing adequate transportation options for our residents. Snelling Avenue is one of the <br />5 corridors being considered for a Bus Rapid Transit corridor. <br />6 Metro Transit has asked the City of Roseville to appoint an elected City Representative to be a <br />"7 part of the Metro Transit Arterial Transitway Corridors Study Stakeholder group. The <br />representative along with the staff representative will provide public support to Metro Transit in <br />9 preparing the Arterial Transitway Corridors Study and serve as a link between the project and <br />I ('-) Roseville residents. <br />"I'll The stakeholder group will hold a workshop on June 30 at 830 -1130 a.m. and another date <br />12 later in 2011. <br />13 POLICY OBJECTIVE <br />14 Ensure that the City has an elected representative at the Metro Transit Arterial Transitway <br />I Corridors Study Stakeholder Workshop. <br />16 FINANCIAL IMPACTS <br />I ��7 None <br />I STAFF RECOMMENDATION <br />19 Appoint a City representative to the Metro Transit Arterial Transitway Corridors Study <br />2 ('-) Stakeholder Workshop. <br />2 1 REQUESTED COUNCIL ACTION <br />22 Appoint a City elected representative to the Metro Transit Arterial Transitway Corridors Study <br />23 Stakeholder Workshop. <br />M <br />Prepared by: Duane Schwartz, Public Works Director <br />Page I of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.