My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0912_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0912_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:45 PM
Creation date
12/22/2011 11:12:18 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. PAYMENT OF COSTS OF PROJECT <br />2 5.1 The costs of the Project will be paid for with available Federal Funds. Total <br />3 Amount awarded.- $,1,331,878 Federal Funds are designated for the following categories.- <br />4 Project development, planning, and design, 13 1,000 <br />5 Education and promotion: $ 10,000 <br />6 Construction: $1,190,878 <br />7 <br />8 5.2 Any Federal eligible construction costs for the project that are not covered by <br />9 Federal Funds shall be shared by the Cities. The cost split will be based on a proportionate share <br />10 of the project cost in each individual City. Cost split based on the Engineer's Estimate.- 30% <br />11 Falcon Heights, 70% Roseville. <br />12 5.3 Any Federal eligible project development, planning and design costs shall be <br />13 shared equally by the Cities. These will include, but not be limited to, the services identified in <br />14 Article 6 hereof, all costs related to obtaining all necessary permits and approvals for the Project, <br />15 costs incurred in agreements, and any and all other costs associated with the Project. <br />16 5.4 Any non- Federal eligible costs for the project shall be paid for by the City in <br />17 which the cost is incurred. <br />18 5.5 All invoices or requests for payment will be approved and paid by Roseville. <br />19 Within 10 days of the end of each calendar month, Roseville shall provide a statement to Falcon <br />20 Heights showing the prior month's activity, the invoices received, the full costs of services <br />21 provided by Roseville staff, and the amount Falcon Heights owes to Roseville for the Project and <br />22 for items outside of the Project, such as those in sections 2.3 hereof Within 30 days of the <br />23 receipt of that statement,, Falcon Heights shall provide in writing a list and explanation of any <br />24 amounts it disputes and pay the undisputed amount. Any disputes regarding payment shall be <br />25 resolved through the dispute resolution process contained in Article 7 hereof. <br />26 5.6 If this Agreement is terminated for any reason, both cities shall nevertheless be <br />27 liable for the payment of their cost share which is incurred up to the date of termination of this <br />28 Agreement, or as a result of termination of this Agreement. <br />K�► il D 1 611 a 9 t1133A I I Do D G <br />3 .1 Roseville will provide qualified engineering employees to perform design and <br />3 1 related technical services to the Project. These services include.- <br />3 a) Complete design and feasibility studies; <br />3 3 b) Conduct public meetings, including informational meetings and meetings <br />3 4 with each city council if necessary; <br />35 c) Prepare plans and specifications; <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.