Laserfiche WebLink
EXHIBIT A <br />THE PROJECT <br />The proposed work will include the construction of a pathway along Fairview Avenue <br />between County Road B and Larpenteur Avenue. The stripin of bike lanes between <br />County Road B and Larpenteur Avenue. The stripin of bike lanes along Larpenteur <br />Avenue between Cleveland and Fairview Avenue. <br />Location <br />Limits <br />Improvement Description <br />Break out <br />Fairview Ave <br />Co Rd B-2 to <br />Construct continuous pathways on both sides <br />Phase 2 <br />Co Rd B <br />of street. <br />Fairview Ave <br />County Rd B to <br />Construct a off- street pathway (8 feet wide) <br />Phase I <br />Larpenteur Ave <br />on the east side of Fairview- upgrade signal <br />system at both County Road B and Larpenteur. <br />Fairview Ave <br />County Rd B to <br />Stripe on-street bike lanes. <br />Phase I <br />Larpenteur <br />Larpenteur <br />Fairview Ave to <br />Stripe on-street bike lanes- upgrade signal <br />Phase I <br />Ave <br />Cleveland Ave <br />system at both Cleveland andGortner. <br />Larpenteur Ave <br />Gortner Ave to <br />Construct new sidewalk along the north side <br />Phase 2 <br />Cleveland Ave <br />An, M <br />M <br />