My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0912_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0912_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:45 PM
Creation date
12/22/2011 11:12:18 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />THE PROJECT <br />The proposed work will include the construction of a pathway along Fairview Avenue <br />between County Road B and Larpenteur Avenue. The stripin of bike lanes between <br />County Road B and Larpenteur Avenue. The stripin of bike lanes along Larpenteur <br />Avenue between Cleveland and Fairview Avenue. <br />Location <br />Limits <br />Improvement Description <br />Break out <br />Fairview Ave <br />Co Rd B-2 to <br />Construct continuous pathways on both sides <br />Phase 2 <br />Co Rd B <br />of street. <br />Fairview Ave <br />County Rd B to <br />Construct a off- street pathway (8 feet wide) <br />Phase I <br />Larpenteur Ave <br />on the east side of Fairview- upgrade signal <br />system at both County Road B and Larpenteur. <br />Fairview Ave <br />County Rd B to <br />Stripe on-street bike lanes. <br />Phase I <br />Larpenteur <br />Larpenteur <br />Fairview Ave to <br />Stripe on-street bike lanes- upgrade signal <br />Phase I <br />Ave <br />Cleveland Ave <br />system at both Cleveland andGortner. <br />Larpenteur Ave <br />Gortner Ave to <br />Construct new sidewalk along the north side <br />Phase 2 <br />Cleveland Ave <br />An, M <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.