My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0912_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0912_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:45 PM
Creation date
12/22/2011 11:12:18 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROSHWEEE <br />1XIEQUEST FOR COUNCIL ACTION <br />Department Approval <br />Date: 9/12/11 <br />Item No.: 7 . i <br />City Manager A. pproval <br />r. <br />V: <br />Item Description: Authorize Short Tenn Closure of Wheeler St. at Co. Rd. D <br />71192o, <br />2 from The City Council discussed a petition received fr the S wo <br />horeod/Wheeler neighborhood <br />3 asking the city to study the permanent closure of the north end of Wheeler St. between <br />4, Shorewood Lane and County Road D at the May 23, 2011 council meeting. After hearing from <br />5 concerned neighborhood residents on the potential traffic impacts from the Presbyterian Homes <br />6 redevelopment project and other cut thru traffic that affects livability in the neighborhood, the <br />"7 Council gave direction to staff to study the closure of Wheeler St. at Co. Rd. D. <br />9 The PWET Commission is in the process of reviewing a draft policy for neighborhood traffic <br />110 management which will guide these type requests in the future if adopted by the City Council. <br />11 We anticipate reviewing the draft policy with the Council later this fall. Work on the Arden <br />12 Hills project is to begin in September and the neighborhood is concerned about the possibility of <br />13 additional traffic. Staff requested Arden Hills to consider requiring the project owner or their <br />14, contractor place the short term closure on Wheeler St. We received a response that the owner <br />15 rejected the request and the city could not require it at this point. <br />116 <br />1 7 Staff will work with the neighborhood residents as to placement of the closure. Public Safety <br />11 111"":1'11 has indicated they do not have any concerns regarding the closure of Wheeler St. They <br />119 requested it be communicated to dispatch staff once it is in place so emergency vehicles are <br />2o routed appropriately. The closure will be placed in a manner which would allow bicycle and <br />2 1 pedestrian traffic to use this street as a means to access Co. Rd. D. <br />22 POLICY OBJECTIVE <br />23 The Comprehensive Plan supports safe, livable neighborhoods and an efficient transportation <br />24, system. <br />� I DUNT*3 <br />26 Staff estimates the cost to place a short term closure of up to one year at $, 1 500 - 000. <br />27 Development of the Neighborhood Traffic Management Policy will include how infrastructure <br />28 improvements to mitigate traffic concerns should be funded. The cost of the short term closure <br />29 would be funded using street infrastructure funds. <br />30 STAFF RECOMMENDATION <br />31 Staff recommends that the City Council authorize the short term closure of Wheeler St. at Co Rd. <br />32 D to allow staff to study the impact on other roads in the area. This issue would come back to <br />33 the City Council at a future date with a recommendation after adoption and implementation of a <br />Page I of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.