Laserfiche WebLink
11 <br />2 Electrical Permit Fees <br />3 <br />4 A. Minimum fee for each separate inspection, of an installation, replacement, <br />C. Circuits,, installation of additional alterations, or repairs of each circuit or sub- <br />feeder shall be computed separately, including circuits fed from sub-feeders and <br />including the equipment served, except as provided for in (D) through (K): <br />Description <br />Current Amount <br />Proposed Amount' <br />. . ............ ... <br />.......... <br />---------- - <br />— - --------- ------ -- - - ___ - - <br />31 to 100 amp <br />Description <br />Current Amount <br />Proposed Amount <br />--------------- <br />0 to 300 <br />pill <br />2:01 to 3 00 amp <br />. . .. ............. . . .... ... ...... <br />301 to 400 amp <br />..... . . . - - ------------- <br />401 to 500 am p <br />401 to 500 amp ... . . .. . ....... - ------ <br />501 to 600 amp <br />• <br />501 to <br />601 to 800 amp <br />911111 i <br />601 to 700 amp <br />.­ ------------ <br />801 to 1,000 arn <br />.. ............ <br />1,101 amp <br />wArarowil <br />C. Circuits,, installation of additional alterations, or repairs of each circuit or sub- <br />feeder shall be computed separately, including circuits fed from sub-feeders and <br />including the equipment served, except as provided for in (D) through (K): <br />Description <br />Current Amount <br />Proposed Amount' <br />. . ............ ... <br />.......... <br />---------- - <br />— - --------- ------ -- - - ___ - - <br />31 to 100 amp <br />--------------- <br />2:01 to 3 00 amp <br />301 to 400 amp <br />401 to 500 amp ... . . .. . ....... - ------ <br />501 to <br />601 to 700 amp <br />