Laserfiche WebLink
h <br />113 consideration of the concept plan on March, 17t <br />114 3.2 In regards to the Springsted proposal, staff is recommending that the City Council authorize <br />115 the City Manager to enter into a contract with Springsted for assistance with determining the <br />116 use of public funds in Twin Lakes. <br />117 <br />118 <br />11-9 Attachments: A. Draft Twin Lakes Allocation Study (Please bring your col2y sent previously <br />120 B. Draft Twin Lakes Public F I*nanc i al Participation Framewo.i m. <br />121. C. Springsted Proposal <br />122 D. Site an for Mc Gough development proposal on the PIK Terminal site. <br />123 E. Twin Lakes Redevelopment Timeline <br />124 <br />125 <br />126 Prepared by, Patrick Trudgeon, Community Development Director (651) 792-7071 <br />