Laserfiche WebLink
'REQUEST FO�R COUNCIL ACTION DATE' -- 1.2/! 2 /8 3 11P <br />1) 'That, sidewalks ble constructed along Rice and South Owasso Boulevard.,.. <br />2,) That, the driveway and interior curbing be installed to brinq the site into <br />iconforimance with the City Code. <br />3) That the canopy be constructed in acico e with the plan dated 7/27/83. <br />i <br />Attached isi the Planner'si report! <br />Counc 411 Action, Requested: Motion approvinig/denying Hoffman Corner Oil's <br />request for a 19.,5 foot variance to slide yard <br />setback for the canopy, and a 3-foot variance to <br />bring the existing, plump islands into conformance <br />with the City Code, at 3011 Rice, (with, the above <br />conditions, if desired). <br />