My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2011_1128
Roseville
>
City Council
>
City Council Meeting Minutes
>
201x
>
2011
>
CC_Minutes_2011_1128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 1:12:47 PM
Creation date
12/27/2011 1:12:44 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
11/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular City Council Meeting <br /> Monday,November 28, 2011 <br /> Page 9 <br /> (Minimum Penalty) and Section 302.15C (Hearing and Notice) of the Roseville <br /> City Code;"as amended with language changed in line 27 to[non-renewal.] <br /> Roll Call <br /> Ayes: Willmus; Johnson; McGehee; and Roe. <br /> Nays: None. <br /> 10. Presentations <br /> a. Ramsey County Presentation of Rice Street Project, Phase II <br /> City Engineer Debra Bloom introduced Ramsey County Project Manager Mr. Jer- <br /> ry Auge for Phase II of the Rice Street Project from County Road B-2 to County <br /> Road C-2. <br /> Mr. Auge provided a history of the Rice Street project to-date; initial participation <br /> by the municipal jurisdictions of Roseville, Little Canada, Vadnais Heights and <br /> Shoreview involved in the initial Technical Advisory Committee (TAC) during <br /> 2006 — 2008; including respective City Councils, business owners, residents, and <br /> respective City staff; with the municipalities of Roseville and Little Canada in- <br /> volved in Phase II portion of the project. <br /> Mr. Auge reviewed 2009 traffic volumes; the existing roadway; proposed im- <br /> provements; impacts to businesses along the Rice Street corridor; existing County <br /> Road C intersection site distance problems on the west side of County Road C and <br /> proposed reconstruction to make the site distance system better by raising the <br /> roadway on the Roseville side, thereby eliminating the need for a split phase for <br /> the signal light allowing more green light time for traffic along the Rice Street <br /> corridor. Mr. Auge also reviewed proposed designated bicycle lanes and striping <br /> to accommodate non-vehicular traffic, and improved operations at intersections <br /> through median installations. <br /> Mr. Auge further reviewed the Little Canada Road intersection; cost participation <br /> for the project, absent federal funding; and city cost-share with city responsibility <br /> to pay for rights-of-way; new sidewalks; any colored portions of concrete boule- <br /> vards; burying of private utilities; street lighting; and Ramsey County responsible <br /> for intersection lighting. <br /> Mr. Auge addressed other design considerations, meeting local watershed re- <br /> quirements; private utility relocation; street lighting; any public infrastructure pro- <br /> jects the respective cities may want to do as part of this project; and receipt of <br /> comments from respective cities and the general public on the proposed im- <br /> provement. <br /> Mr. Auge provided the projected project schedule: Final Plan Design through <br /> 2012; Rights-of-Way Plan completed in January of 2012; rights-of-way acquisi- <br />
The URL can be used to link to this page
Your browser does not support the video tag.