My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0324_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0324_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 3:16:25 PM
Creation date
12/27/2011 2:15:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: 3/2/408 <br />Item: 7 j <br />Geothermal Project <br />KFI continu�es to clevelop the City Hall cam�pu�s m�aster plan sim�u�ltaneou�sly with <br />the clesign of the arena project and is anticipated to be su�bstantially com�plete bi <br />the end of April. This inform�ation will provid clance to the City Cou�ncil on <br />fu�tu�re costs and phasing d will be valu�able inform�ation <br />when making a c ed being at <br />you�r May 19 meeting. <br />Staff and d ASU to m�ove throug Pq <br />the process for the; project, phased plan and ocll� <br />The anticipated sched�u�le lead p to selecting a contractor is as follows: <br />April I st, 2008 <br />April I Oth 2008 <br />April 18th, 2008 <br />April 23rd, 2008 <br />, Ell FARM U10 El 09 <br />Al"I'm <br />May 14 th 2008 <br />May I 9th 2008 <br />FBI= R 9S T17 <br />gMSM'pre bid meeting <br />ZOM! MI <br />AWy best-valu�e contractoL <br />r m�eeting (potential best-valu�e only) <br />SIR <br />A proposal to select a contractor is anticipated to be brou�ght to the City Cou�ncil <br />for consid�eration on May I 9th 2008. <br />Thank you and qestions. <br />r1d, <br />
The URL can be used to link to this page
Your browser does not support the video tag.