Laserfiche WebLink
Parking Lot Pathwa Reclai ing <br />Ace Blacktop <br />Tower Asphalt <br />Midwest Asphalt <br />Paragon <br />T. A. Schifsky <br />Central Park Pth�y <br />$0.60 s.y. <br />$ 1.5 5 s.y. <br />$5.25 s.y. <br />County B Pthwy <br />$0.60 s.y. <br />$1.15 s.y. <br />$ 2.7 5 s.y. <br />Central Pk Pkg Lot <br />$0.50 s.y. <br />$0.664 s.y. <br />I. r22 s.y. <br />$1.10 S.Y. <br />7 FINANCIAL IMPACTS <br />Street maintenance materials, contractual concrete work, paving, reclamation, and miscellaneous <br />patching are funded in the Street Maintenance, Pathway and Parking Lot Maintenance, and <br />20 Utility budgets. The bids received are reflective of the current market rates for the items bid. <br />2 We continue to see increases in these materials and services. Bids received are above the <br />22 amounts budgeted for due to increased energy costs for production of the materials and <br />2 transportation costs. <br />2,4 <br />25 STAFF RECOMMENDATION <br />2 E,,, Staff recommends to award to the low bidder in each of the categories listed above. <br />27 <br />REQUESTED COUNCIL ACTION <br />Motion accepting the following bids for street maintenance materials and contractual work: <br />I. Class 5 aggregate base <br />2. LVNW35030B Base Asphalt 34!} <br />3. LVWE45030B Asphalt Wear Mix 1/2„ <br />4. LVWE35030B Asphalt Wear Mix34 99 <br />5. CRS-2 Asphalt oil <br />6. FA-2 Seal Coat Aggregate <br />7. Miscellaneous concrete sidewalk, <br />pedestrian ramps, and curb replacement <br />8. Bituminous miscellaneous milling, patching <br />and paving <br />9. Reclaim pathway and parking lot <br />10. Pathway Paving LVWE45030B 12 99 <br />11. Parking lot paving <br />Prepared by: Steve Zweber, Streets Supervisor <br />Page 4 of 4 <br />Aggregate Industries <br />Bituminous Roadways <br />Bituminous Roadways <br />Bituminous Roadways <br />Meigs Oil <br />Martin Marietta <br />Kassa Concrete <br />Bituminous Roadways <br />Ace Blacktop <br />Tower Asphalt <br />Tower Asphalt <br />