Laserfiche WebLink
2009 — 2018 Capital Improvement Plan <br />Item.. Stormwater Sewer Mains Division.- Storm. <br />Year. 2009-2018 Cost. $2,550POOO <br />Status. ,50,000 available (projected) <br />Description: <br />The City's Stormwatcr system requires regular maintenance and replacement of stormwatcr <br />mains that are used to capture and divert runoff. <br />1b-- 1 r6 - <br />W I t ki, <br />Funding Sources <br />1 1 <br />LM 1 <br />1 <br />1 <br />lm WOIM <br />1 - iWFAUM I t <br />Property taxes <br />200.1 00 <br />200.1 00 <br />250.1000 <br />2 0.10 0 <br />250.1000 <br />t .1400.1 00 <br />Other <br />- <br />- <br />- <br />- <br />- <br />- <br />Total Sou:rc s <br />200.1 00 <br />200.1 00 <br />250,000 <br />$250.1000 <br />$250.1000 <br />t .1400.1 00 <br />Expenditures <br />Capital r lac ment <br />200.1 00 <br />200.1 00 <br />$250.1000 <br />$250.1000 <br />$250.1000 <br />t .1400.1 00 <br />Other <br />- <br />- <br />- <br />- <br />- <br />-1 <br />Total Expenditures <br />200.1 00 <br />200.1 00 <br />250,000 <br />$250,000 <br />$250,000 <br />t .1400.1 00 <br />Oi) erations and Maintenance Costs <br />Property Funding Sources <br />Total urces ► <br />Expenditures <br />Other - - - - - - <br />1 Total Expenditures <br />No op erational casts are shown. There is no significant change in op erational casts. <br />3 <br />LOYA <br />