Laserfiche WebLink
City of Roseville 2009 Fee Schedule <br />Demolition Permit Fee: <br />Description <br />Tenant improvement/r modeling, prior to building, <br />permit <br />Current Amount <br />$58.00 <br />Proposed Amount <br />$61.00 <br />Structures not connected to utilities <br />58.00 <br />61.00 <br />Residential structures connected to city utilities <br />117.00 <br />122.00 <br />Fc ommer,cial structures connected to city utilities <br />$265. 00 <br />$00 <br />27. <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000) <br />Grading Plan Review Fee: <br />Description <br />Current Amount <br />Proposed Amount <br />50 cubic yards or less <br />$0 <br />$0 <br />$56.00 for the first 10,000 <br />$100.00 for the first 10,000 <br />51 - 100,000 cubic yards <br />cubic yards, plus $27.00 for <br />cubic yards, plus $30.00 for <br />each additional 10,000 yards <br />each additional 10,000 yards <br />or fraction thereof <br />or fraction thereof <br />$300.00 for the first 100,000 <br />$400.00 for the first 100,000 <br />100,001 - 200,000 cubic yards <br />cubic yards, plus $16.00 for <br />cubic yards, plus $20.00 for <br />each additional 10,000 yards <br />each additional 10,000 yards <br />or fraction thereof <br />or fraction thereof <br />$457.00 for the first 200,000 <br />$600.00 for the first 200,000 <br />In excess of 200,000 cubic yards <br />cubic yards, plus $9.00 for <br />cubic yards, plus $10.00 for <br />each additional 10,000 Yards <br />each additional 10,000 yards <br />or fraction thereof <br />or fraction thereof <br />LON <br />