Laserfiche WebLink
City of Roseville 2009 Fee Schedule <br />Mechanical Permit Fee - Residential: <br />Description <br />Air conditioning, - new <br />Current Amount <br />$41.00 <br />Proposed Amount <br />$43.00 <br />Air conditioning - replacement <br />52.00 <br />55.00 <br />Warm air furnace - new <br />87.00 <br />91.00 <br />Warm air furnace - replacement <br />52.00 <br />55.00 <br />Hot water boilers - new <br />87.00 <br />91.00 <br />Hot water boilers - replacement <br />52.00 <br />55.00 <br />Unit heaters <br />52.00 <br />55.00 <br />Swimming, pool heaters <br />52.00 <br />55.00 <br />Misc. work & gas piping, <br />1.25% cifjob cost <br />1.25% cifjob cost <br />Minimum fee <br />5 2.0 0 <br />5 5.0 0 <br />Gas fireplace <br />$52.00 <br />$55.00 <br />Mechanical Permit Fee - Commercial: <br />All commercial work <br />Moving Permit Fee: <br />1.25% of iob cost <br />Plumbing Permit Fee: <br />Plan Review Fee: <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-I and R-2 <br />zones which do not involve new single family structures and are of less than seven thousand <br />dollars ($7,000.00), shall be sixty five percent (65%) of the building permit fee as set forth in <br />Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. I 110, 4-13 - <br />1 992) <br />IN <br />