My WebLink
|
Help
|
About
|
Sign Out
Home
2008_1117_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_1117_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:47 PM
Creation date
12/28/2011 9:25:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2009 Fee Schedule <br />Electrical Permit Fees <br />A. Minimum fee for each separate inspection of an installation, replacement, <br />alteration or repair is limited to one inspection only: <br />Current Amount Proposed Amount <br />B. Services, changes of service, temporary services, additions, alterations or repairs <br />on either primary or secondary services shall be computed separately: <br />Description <br />Current Amount <br />Proposed Amount <br />301 to 400 amp <br />401 to 500 amp <br />501 to 600 amp <br />11 <br />601 to 800 amp <br />801 to 1,000 amp <br />1,001 to 1,100 amp <br />19101 to 1,200 amp <br />Add $14 for each add'l 100 amps <br />C. Circuits, installation of additions, alterations, or repairs of each circuit or sub- <br />feeder shall be computed separately, including circuits fed from sub-feeders and <br />including the equipment served, except as provided for in (D) through (K): <br />Description Current Amount Proposed Amount <br />31 to 100 amp 1 11 1 11 <br />101 to 200 amp 11 11 <br />201 to 300 amp 1 11 1 11 <br />301 to 400 amp 11 11 <br />401 to 500 amp 1 11 1 11 <br />501 to 600 amp 11 11 <br />601 to 700 amp X111 X111 <br />Add $5 for each add'l 100 amps <br />D. Maximum fee for single-family dwelling shall not exceed $150.00 if not over <br />200-ampere capacity. This includes service, feeders, circuits, fixtures and <br />equipment. The maximum fee provides for not more than two rough-in <br />inspections and the final inspection per dwelling. Additional inspections are at <br />the re-inspection rate. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.