Laserfiche WebLink
Iron g Term Goals <br />Develop program to provide fire, safety, The Fire Dept will begin offering CPR/AED at a rate of $80 per student and <br />CPR, fire extinguisher training to Safety Training at a rate of $80 per hour. Costs will cover prorated trainer's <br />businesses salar y /benefits, books, training materials, administrative time. These <br />services will be offered to businesses once the City's fee schedule is <br />amended to include these fees and this JR2025 goal will be complete. RG 7108 <br />Community Center Discussion Will be incorporated into the anticipated Master Plan process to determine <br />need and locations. LB 7108 <br />Establish a Community Resource and Researching possible resources needed to establish such a program and <br />Volunteer Center/Network with support what a program of this type would look like. LB 7108 <br />and coordinating staff to recruit, train, <br />nurture volunteers. <br />Identify segments with poor or no Discussed as part of Pathway Plan update, incorporate into final draft plus <br />connection. Follow Master plan guide. additional locations. DS 7108 <br />Address Hwy 36 and Snelling crossing <br />barriers: tunnels or bridges at Lydia, Co <br />C, Co B, or Roselawn <br />Consider Roundabouts, if space and Look into ROW requirements and identify possible corridors 2009. DS 7108 <br />buying R.O.W. is feasible <br />Add buses and routes for flexibility and Continue to push this issue in all discussions with Metro Transit. DS 7108 <br />suburb-to-suburb travel <br />Encourage development of transit, Identify needs in CIS' 2009-2018 Meeting with Northeast Diagonal cities to <br />walkability and alternate transportation pursue getting corridor back into 2030 Plan. DS 7108 <br />These items are being emphasized in the Comprehensive Plan Update with <br />the goal of making alternative forms of a greater priority in the community's <br />growth and redevelopment in the future. PT 7108 <br />Work w/ Metro Transit to identify Underway for Twin Lakes, additional future needs along Hwy 36 corridor <br />location of long-term park-n-ride facility east end of Roseville. DS 7108 <br />Continue to lobby for the Northeast Meeting with adjacent cities July 2008. DS 7108 <br />Diagonal transit line <br />