My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0721_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0721_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:49 PM
Creation date
12/28/2011 11:04:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 — 2018 Capital Improvement Plan <br />Public Works <br />Water Utility <br />Water Storage Tank painting and <br />rehabilitation <br />The City water storage tank was last <br />rehabilitated in 1995. Inspection has indicated <br />a need for repainting in the near future. Spot <br />repairs and additional rehabilitation will be <br />determined during project development. Paint <br />systems have 10-15 year useful life. Tank is <br />inspected at 5 year intervals to identify <br />potential developing rust and flaws. Protection <br />of underlying metal structure critical to the <br />longevity of the structure. <br />Supports systematic programs for <br />infrastructure replacement <br />Annual budget and water rate <br />recommendation to reflect cost of painting and <br />repair at 15 year intervals. Estimated <br />$,500,000 project cost for 2011. <br />Added 5 years to CIP. No ch�ange in projecte <br />cost for project. i <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.