My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0721_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0721_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:49 PM
Creation date
12/28/2011 11:04:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 — 2018 Capital Improvement Plan <br />Public Works <br />Sanitary Sewer Utility <br />Lift Station replacement and upgrades <br />The City sanitary sewer system operation <br />requires dependable lift station pumps, control <br />systems, and monitoring equipment for <br />emergency response for citizen heath and <br />safety and prevention of property damage due <br />to sewer flow backup. Replacement of <br />operational equipment at the end of its useful <br />life is critical to providing uninterrupted flow of <br />wastewater from homes and businesses to <br />regional treatment facilities. <br />Supports systematic programs for equipment <br />replacement to ensure uninterupted system <br />operation <br />Annual budget and sewer rate <br />recommendation to reflect cost of lift station <br />equipment replacement based on <br />depreciation schedules and annual review of <br />equipment needs schedule. <br />Added 5 years to CIP. Adjusted capital needs <br />to reflect projected capital replacement <br />wt <br />
The URL can be used to link to this page
Your browser does not support the video tag.