Laserfiche WebLink
City of Roseville 2009 Fee Schedule <br />Demolition Permit Fee.- <br />Electrical Permit Fee.- <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safely Inspection Fee.- <br />An amount equal to eight percent (8%)l of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, eff 5-1-2000), <br />Grading Plan Review Fee.- <br />Description <br />Current Amount <br />Proposed Amount <br />50 cubic yards or less <br />$,0 <br />$,0 <br />$,56.00 for the first 10,,000 cubic <br />$,56.00 for the first 10,,000 <br />51 — 100,,000 cubic yards <br />yards, plus $,27.00 for each <br />cubic yards, plus $,27.00 for <br />additional 10,,000 yards or <br />each additional 10,000 yards or <br />fraction thereof <br />fraction thereof <br />$,300.00 for the first 100,,000 <br />$,300.00 for the first 100,,000 <br />IWPOO I — 200,,000 cubic yards <br />cubic yards, plus $,16.00 for <br />cubic yards, plus $,16.00 for <br />each additional 10,,000 yards or <br />each additional 10,000 yards or <br />fraction thereof <br />fraction thereof <br />$,457.00 for the first 200,,000 <br />$,457.00 for the first 200,,000 <br />In excess of 200,,000 cubic yards <br />cubic yards, plus $,9.00 for each <br />cubic yards, plus $,9.00 for each <br />additional 10,,000 yards or <br />additional 10,,000 yards or <br />fraction thereof <br />fraction thereof <br />0 <br />