Laserfiche WebLink
City of Roseville 2009 Fee Schedule <br />Mechanical Permit Fee - Residential.- <br />Description <br />it conditioning — new <br />Current Amount <br />$,41.00 <br />Proposed Amount <br />$,41.00_ <br />it conditioning — replacement <br />52.00 <br />52.00 <br />Warm air furnace — new <br />87.00 <br />87.00 <br />Warm air furnace - replacement <br />52.00 <br />52.00 <br />Hot water boilers — new <br />87.00 <br />87.00 <br />Hot water boilers — replacement <br />52.00 <br />52.00 <br />Unit heaters <br />52.00 <br />52.00 <br />Swimming pool heaters <br />52.00 <br />52.00 <br />Misc. work & as piping <br />1.25% of job cost <br />1.25% of job cost <br />Minimum fee <br />52.00 <br />52.00 <br />Gas fireplace <br />$,52.00 <br />$,52.00 <br />Mechanical Permit Fee - Commercial.- <br />All commercial work <br />Moving Permit Fee.- <br />1.25% of iob cost 1 1.25% of iob cost <br />Plumbing Permit Fee.- <br />Plan Review Fee.- <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-I and R-2 <br />zones which do not involve new single family structures and are of less than fifteen thousand <br />dollars ($,18,000.00)1, shall be sixty five percent (65%) of the building permit fee as set forth in <br />Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 1110, 4-13 - <br />1 <br />HE <br />