My WebLink
|
Help
|
About
|
Sign Out
Home
2008_1013_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_1013_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:48 PM
Creation date
12/28/2011 11:52:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
InAude shade pavi�ions and/or park <br />shelters at all parks to promote <br />neighborhood connections and <br />accommodate neighborhood gatherings <br />Revise water rates from u.se base to <br />conservation base incentives for 1 - % <br />reduction in residential and business <br />usage <br />Fund Citywide traffic model <br />Encourage development of transit, <br />walkability and alternate transportation <br />Iron g Term Goals <br />Pathway Plan update underway. DS 7108 <br />Met with six firms to gather pre request for proposal (RFP nformation. <br />Plan to discuss further with Parks and Recreation Commission at an <br />upcoming meeting. LB 7108 <br />Will be incorporated into the anticipated Master Plan process to determine <br />need and locations. LB 7108 <br />PWETC recommendation for 2009 implementation at September 08 <br />meeting. Anticipate Council discussion November 2008. DS 10108 <br />Discussed with PWETC April, 2008 Council discussion August/September <br />2008. DS 7108 <br />Initial discussions are expected in the Fall of '08, but our rate structure is <br />heavily dependent on high water users to support utility operations. It is <br />unlikely that our rate structure could be changed to a conservation base <br />until 2010. CM 7108 <br />No new activity. DS 10108 <br />CIS' discussion item. DS 7108 <br />Comp Plan Transportation section discusses each of these 'Items. <br />Council discussion October 08. Ds iolo8 <br />Livable Communities concepts incorporated into design guidelines, <br />Pathway Master Plan discusses ped and bike goals and policies.. 7108 <br />Develop program to provide fire, safety, The Fire Dept will begin offering CPR/AED at a rate of $80 per student and <br />CPR, fire extinguisher training to Safety Training at a rate of $80 per hour. Costs will cover prorated trainer's <br />businesses salar y /benefits, books, training materials, administrative time. These <br />services will be offered to businesses once the City's fee schedule is <br />amended to include these fees and this JR2025 goal will be complete. RG 7108 <br />Community Center Discussion Will be incorporated into the anticipated Master Plan process to determine <br />need and locations. LB 7108 <br />Establish a Community Resource and Researching possible resources needed to establish such a program and <br />Volunteer Center/Network with support what a program of this type would look like. LB 7108 <br />and coordinating staff to recruit, train, <br />nurture volunteers. <br />Identify segments with poor or no Pathway Master Plan adopted September 08. Seeking funding <br />connection. Follow Master plan guide. opportuni-ti-es.DS 10108 <br />Address Hwy 36 and Snelling crossing <br />barriers: tunnels or bridges at Lydia, Co Discussed as part of Pathway Plan update, incorporate into final draft plus <br />C, Co B, or Roselawn additional locations. DS 7108 <br />Consider Roundabouts, if space and No new activity. DS 10108 <br />buying R.O.W. is feasible <br />Look into ROW requirements and identify possible corridors 2009. DS 7108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.