Laserfiche WebLink
INTRODUCTION <br />The City of Roseville has conducted an alternative urban area-wide review (AUAR for the Twin <br />Lakes, redevelopment area in the northwest part of the City. It has been determined that the land <br />use projections, proposed as part of the Twin Lakes, AUAR will have a significant impact on the <br />City's, transportation infrastructure as a whole. More specifically, these land use projections, will <br />have a direct impact on the roadway network immediately adjacent to the Twin Lakes, <br />redevelopment area. <br />As part of the Twin Lakes A UAR Update (adopted in October, 2007), three land use scenarios, <br />were developed. Scenario A, from the Twin Lakes AUAR Update, represents, the intent of the <br />comprehensive plan and is inclusive of all major land use redevelopment options,, based on a <br />worst -case redevelopment scenario for traffic generation. Each of the other two redevelopment <br />scenarios, (B and Q was developed with a conscious, effort to balance land use size and trip <br />generation. Developing the proper balance between land use size and amount of trips, generated <br />ensures, that feasible redevelopment alternatives, are reviewed in relation to their potential traffic <br />impacts,. Scenarios, B and C are similar with their amount of traffic generated and require the <br />same mitigation measures, on the adjacent roadway network to achieve acceptable operations,. <br />For purposes, of this analysis, these two land use scenarios, were reviewed. Using information <br />compiled from our review of these scenarios, we have prepared a summary allocation <br />representing a cost per network trip. The summary allocation is broken down into three distinct <br />land use categories: Residential, Commercial -office and Commercial -retail. A network trip is <br />defined as a vehicular trip that moves, throughout the Twin Lakes, redevelopment area and the <br />other adjacent intersections, identified in the Twin Lakes A UAR Update. <br />As requested, we have completed concept layouts, and cost estimates, for each of the roadway <br />infrastructure improvements, identified in the Twin Lakes A UAR Update (scenarios, B and Q and <br />allocated the cost of these improvements, to the appropriate land use subsets, in the redevelopment <br />area. In addition, we have developed a needs, assessment for the utilities, and associated cost <br />estimates,. These utility costs, have been allocated to the respective Twin Lakes, redevelopment <br />area blocks, as identified in the update documentation (see Figure 1: Twin Lakes, AUAR <br />Boundary Map). <br />Our work on this project includes, the following: <br />• Comprehensive list of roadway infrastructure improvements, for the Twin Lakes, <br />redevelopment area, <br />• Concept sketches,, right-of-way needs, and preliminary cost estimates, for all roadway <br />infrastructure improvements,, <br />• Summary allocation of roadway infrastructure improvement costs, based on cost per <br />network trip, <br />• Preliminary cost estimates, for the public utility needs, in the area (sanitary sewer, storm <br />sewer, water main) <br />• Allocation of the utility costs, to the appropriate Twin Lakes, redevelopment area blocks,. <br />City of Roseville Twin Lakes AUAR Area <br />February 2008, Infrastructure Improvements <br />Page 1 <br />