Laserfiche WebLink
735 conservation practices and planning activities that minij nizie soil erosion and sedimentation. If <br />4 <br />736 this Section 10 18) imposes a requirement different from other sections of the city code, the <br />737 more restrictive section shall apply. <br />73 8 -10V 1018,021,,w SCOPE. <br />739 Except as exempted by the definition of the term "land disturbance activity" in Section <br />7410 +W-PI 10 19 .03, any person, state agency, or political subdivision thereof prop oshig and <br />741 disturbance activity, within the City shall apply to the City for the approval of the erosion and <br />742 sediment control plan. No land shall be disturbed until the plan is approved by the City and <br />743 conforms. to the standards set forth in this article. <br />744 VM 1018,03: DEFINITIONS, <br />745 EROSION AND SEDIMENT CONTROL PLAN means a document containing the requirements <br />746 of Section X 10 19 .04 that, when implemented, will prevent or minimize soil erosio'n on a <br />747 parcel of land and off-site sediment damages. <br />748 101-7 1018*0416* STORM WATER MANUAL:. EROSION AND SEDIMENT <br />749 CONTROL PLAN** <br />750 14P1018.0516* REVIEW OF PLAN. <br />751 44471018.06: IMPLEMENTATION AND MAINTENANCE OF PLAN* <br />752 1AW 1018,07: MODIFICATION OF PLAN: <br />753 An approved erosion and sediment control plan may be modified on submission of an application <br />754 for modification to the City and subsequent approval by the City Engineer, In reviewing such <br />755 application, the City Engineer may require additional reports and data. <br /># 0 <br />75 6 ,1018 <br />-PM,08, ESCROW REQUIREMENT* <br />757 After approval of an erosion and sediment control plan, the City shall require the Permittee to <br />758 escrow a sum of money sufficient to ensure the installation, completion,, and maintenance of the <br />759 erosion and sediment control plan and practices. Escrow amounts shall be set from time to time <br />7160 by the City Council. Upon project completion, the remaining escrow shall be returned to the <br />7161 Permil"ttee. <br />1762 -10V1018,,,09: EROSION AND SEDIMENT CONTROL PERMIT <br />763 ENFORCEMENT: <br />764 D. Failure, to Do Corrective Work. When a Permittee fails to conform to any provision of this <br />765 piolicy within the time stipulated, the City may take the following actions: <br />766 4. All costs *incurred by the City in correcting erosion and sediment control deficiencies shall <br />7167 be reimbursed by the Permittee. If payment is not maide within thirty (30) days after costs <br />7168 are incurred by the City, payment will be made from the., Permittee's financial securities, as <br />7169 described in Section 10 IS. 0 8 of this Ordinance. <br />770 5. If there is an insufficient financial amount "in the Perm,ittee's financial securities as <br />771 J described in Section 44P 10 18 .0 8 of th 'is ordinance to cover the costs incurred by the City <br />772 then the City may assess the remaining amount against the property. As a condition of the <br />27 <br />