Laserfiche WebLink
Attachment 3 <br />QUESTIONS FROM THE PUBLIC REGARDING T'HE <br />COUNTY ROAD C-2, TRAFFIC STUDY <br />2. H�ow much of the cost of an MSA road is the city"s responsibility? <br />RESPONSE: According to current City of Roseville Assessment policy, 25% of the cost <br />to construct a 32 foot wide 7-ton road is assessed to all abutting property owners. The <br />City uses MSA funds to pay for the remaining costs. MSA routes are constructed to a <br />10-ton design, with a width sometimes exceeding 32 feet. <br />4. By what percentage will traffic increase on County Road C2 between Lexington and <br />Victoria for the year 2011 if C2 were connected�? <br />RESPONSE: Year 2011 daily traffic volumes along County Road C2 can be expected to <br />increase by approximately 25 percent west of Hamline Avenue, approximately 400 <br />percent between Hamline Avenue and Lexington Avenue, and approximately 30 percent <br />east of Lexington. <br />i. If C2 were connected�, would there be more traffic on Josephine Road or on County Road <br />C2 between Snelling and Victoria for the year 2011? For the year 2030? <br />RESPONSE: Based on our understanding of travel pattem shifts with County Road C2 <br />connected, more traffic would be on County Road C2 between Snelling Avenue and <br />Victoria Street under year 2011 and year 2030 conditions. <br />