My WebLink
|
Help
|
About
|
Sign Out
Home
2011-08-02_PR_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2011
>
2011-08-02_PR_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2012 1:20:07 PM
Creation date
1/4/2012 9:57:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vra BOA" OF WATER COMMISSIONERS <br /> 11�.R <br /> 9 2011 <br /> 11111 UP <br /> President.,Pahick H is Vice President:John Zanmi'ller <br /> am <br /> Commissioners.-Matt Anfang * James Bykowski * Lee Helgen Gn�gory Kleindl <br /> .................... ............................................................................................................................................................................ WN/01....................................................................................................................................................................................................................................... <br /> July 15,2011 <br /> RE: Dale Street Reservoir Construction <br /> Reservoir Woods <br /> Dear Resident: <br /> Demolition of the old reservoir located in Roseville's Reservoir Woods has been completed, and <br /> construction of the now Dale Street Reservoir is currently underway. This reservoir is being <br /> constructed within the"foot print'of the old reservoir. Construction will continue through the summer <br /> and fall of 2011. In the fall of 2011 construction work will cease for a winter shutdown and resume in <br /> the SPrM9 of 2012. The tank is scheduled for completion in the M of 2012. <br /> Construction crews will continue to need access to the site for the delivery of concrete and materials <br /> for the tank construction. Due to the large amount of truck traffic during the construction of the new <br /> reservoir,the recreational trail adjacent to the reservoir will be detoured for safety reasons. We ask that <br /> park users follow the detour and please stay out of the construction site. <br /> If you have any questions or would like more information about the project,please cdl either of the <br /> undersigned. <br /> Sincerely, <br /> IAO;77 Ao;�� <br /> Tina Bagstad Jon D. Peterson <br /> Saint Paul Regional Water Services Bolton&Menk, Inc <br /> 651.266.6283 507.625.4171 <br /> ......................... ........................................................................................................ ................................1.11,11,111,111,1111,'ll""I'���������������'ll""I'll""'ll""I'll""I'l'll""I'll,�l'((('((('((('((�/��P��J�j/�//�`J)))))))))))............................................................................................................. ............ .........................................................................................................."I'l""I'l�.,�.��.��.-�-�-�-�-�-�....................................................... ............................................. .......... ................... <br /> SAINT PAUL RF,GioNAL WATER SFRvims <br /> Stephen P. Schneider,General Manager <br /> 1900 Rice St. Saint Paul MN 55113-6810 + TTY-. 651-266-6299 + 651-266-6350 <br /> Saint Pazd Regionat Water Services provides quality water services to the follorwing cities: <br /> Arden Hffls*Fa1cm HeightsoLauderdaleoLiffle Canada.@Maplewood■mendota-@Mendota HeightsoRoseviHe■Saint Paulo West St Paul <br /> AA-ADA-EEO Employer 4 printed on recyded paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.