Laserfiche WebLink
responsibilities dcscn*bed in Attachment III to this Agreement. The Grantee has the <br />cesponsibility for and obligation to complete the Project as described in Attachment III <br />The Council makes no representation or warranties With respect to the success <br />md effectiveness of the Project. <br />The G.O. Grant camot be used f o r norn-ial municipal operating or overhead costs <br />related to the Project. G.O. Grant funds can-not be used for the costs of studies or for <br />I a <br />engineenng or planning costs, or for equipment, machinery, supplies or other property <br />necessary to conduct the Project except for equipment, supplies or- other property which <br />will be used primarily for the Project and that are specifically listed in Attachm-ent M <br />Section 2.04 Operation of the Real Property and Facility. The Real Property <br />2-nd Facility must be used by the Grantee or'the Grantee must cause such Real Property <br />:znd Facility to be used for the operation of the Governmental Program or for such other <br />use as the Minnesota legislature may from time to time designate, and for no other <br />E 111 111 11 <br />J I IT 11 1 <br />. M 0 1 IC 1111 111,'' <br />Section 2.05 Grantee Representations and Warranties. The Grantee further <br />covenants with, and represents and warrants to the Council as follows- <br />M <br />