Laserfiche WebLink
J. The Cotuicil shall have received evidence upon request, and in form an? <br />substance acceptable to the Council, that the Project will be completed in a manner <br />that will allow the Real Property and Facility to be operated in the manner specified <br />0 <br />in Section 2.04., <br />K. The Council shall have received evidence upon request, and in form and <br />substance acceptable to the Council, that the Grantee has the ability and a plan to <br />Cund the operation of the Real Property and Facility in the manner speciffied in <br />Section 2.04. <br />L. The Council shall have received evidence upon request, and in fonn ani <br />zubstance acceptable to the Council, that the insurance requirements under Section <br />7.01 have been satisfied. <br />M. CONTENTS HAVE BEEN DELIBERATELY OMITTED FROM <br />THIS &,GU-E11E-VT. M <br />N. No Event of Default under this Agreement or event which would <br />0 <br />constitute an Event of Default but for the requirement that notice be given or that a <br />-Coleriod of grace or time elapse shall have occurred and be continuing. <br />Q. The Grantee has supplied to the Council all other items that the Council <br />L-nay reasonably require. <br />Section 6.05 Construction Inspections. The Grantee and the Architect, if any, <br />.shall be responsible for making their own inspections and observations of thTo <br />25 <br />